Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Starting this page for scoping - Christina Riley to add initial detail.




Responsible Person:
Other parties to review/input:
FYI:
Targeted release date:
Jira Legacy
serverSystem JIRA
columnsfix verified date
maximumIssues20
jqlQuerysummary ~ "ineligible" OR description ~ "ineligible"
serverId3420e60a-4e6f-3f80-8335-059c22bb40aa
Jira Status:
Jira Legacy
serverSystem JIRA
columnsstatus
maximumIssues20
jqlQuerysummary ~ "ineligible" OR description ~ "ineligible"
serverId3420e60a-4e6f-3f80-8335-059c22bb40aa

Process

...


Status


#
Step
Status
1Responsible prepares rough business analysis/reqs doc

...

IN PROGRESS Pierre Dane
2Get CHAI review
3Get Akros Review
4Get Ona feedback

...

5Responsible - 1 iteration for feedback
6Ona sign off
7Ona tech spec scoping
8Ona LOE 
9Ona scheduling


Definitions

  • DT comment: Christina Riley, can you please review and validate these definitions?
  • Inactive structure: a non-valid structure that was created erroneously and should be removed from play completely (e.g., duplicate residential structure record created by accident)
    • This is effectively soft deleting the structure
  • Ineligible structure: a valid structure that is ineligible to participate in an intervention for a valid reason (e.g., a residential structure where the inhabitants are not currently residing , but may return in the future) 
    • This is a form field specific to the activity

Notes

  • The ability to mark a structure as ineligible is the priority feature - the feature to mark structures as ineligible can be developed in a future release
  • No structures are ever deleted from Reveal, they can only be marked as inactive

Requirements

Inactive


Ineligible

  1. Any structures that have been marked as ineligible should be removed from the target denominator for the intervention
  2. Ineligibility is intervention-specific (e.g., Christina Riley: can you add an example?)
    1. Non-residential structures should not be considered for IRS
    2. Non-residential structures should not be considered for RACD
  3. Christina Riley: can you please describe the envisaged workflow for a user to determine a structure is ineligible, and then to mark it so?

...