Focus Investigation - Task-based business status colours
Craig Appl this is the beginning of the scoping that Christina Riley created and validated with CHAI and BVBD.
Thailand Task Hierarchy and Color-coding for R2
The color/marking indicates the completion* of the given task at the point / structure. Color-coding is currently dependent on which tasks are included in the given plan. The usage of one color-set for all plans was discussed (see parentheses), but the Thailand team preferred to use green to indicate that all tasks (even for single-task use cases) have been completed. Ideally these colours apply both to the map view and the list view. The user also needs a legend of these colours available somewhere in the UI.
Multi-task use Cases (most Focus investigations)
- Structure tasks
- Enumerated / structure added: YELLOW
- Family registration: PINK
- Index case confirmed: Two radii (structure & 1km)
- RACD / MBS: PURPLE
- Bednet distribution / VC: BLUE
- All activities complete for structure: GREEN
Fam registration not possible to complete REDSamuel Githengi - you can ignore this (& the others that have been struck through below) for now - I'm leaving it in so we can discuss & potentially scope later, thanks!
‘Single-task’ use cases (once families are registered)
- Net Distribution
- Enumerated / structure added: YELLOW
- Family registration: PINK
- Distribution (at least 1 net): GREEN (blue)**
Fam registration not possible to complete RED
- A1 Mass Blood Screening / ACD
- Enumerated / structure added: YELLOW
- Family registration: PINK
- Complete screening: GREEN (purple)**
Fam registration not possible to complete RED
** We discussed alternatively using a set color for each unique task to indicate ‘structure done’ for that desk.
See Reveal Android Client Business Logic document for a detailed breakdown of the following:
- Entomological point tasks
- BCC (focus-level)
- IRS
- Case Confirmation
*Assumptions
- ICC, RACD, & BD are all dependent on the family being registered so fam registration is assumed to have been done if a structure is purple, blue, or green and/or has a radius drawn around it.
- RACD has been done but BD has not been completed if the structure is purple (because otherwise, it would be green if both were completed).
- BD has been done but RACD has not been completed if the structure is blue (because otherwise, it would be green if both were completed).
- *‘Completion’ for family registration, RACD, and BD tasks is based on at least 1 form being completed, i.e.:
- Family registration: the head of household has been registered.
- RACD: at least 1 form has been completed, even if the individual refused to be tested.
- Bednet distribution: the form has been completed, even if no nets have been handed out.
Software Development Required
This section defines what needs to change in the system:
What needs to change:
- If a family has been registered at that location the color will be pink.
- If a bednet distribution
taskform has been completed for that structure, the color will be blue. - If
allany blood screening tasks have been completed at the location, the color will be purple.
Craig Appl Annie Martin - Can we discuss fam-registration changes further & the 'in-progress' recommendation below as it applies to changes 2 & 3.
What doesn't need to change:
- If the location has not been enumerated, no family registered, we keep it as yellow
- We do not change any colors for larval dipping, mosquito collection or IRS tasks
- We do not change the drawing of the circles radius around the case confirmation location
Scoping how we show that tasks are in Progress
There's a need to display that a task is currently in progress. We need to come up with a visual way to display that, for example the "MBS task set" has already started, but it is not complete. Currently, we change it to to purple if any blood screening task has been completed.
Idea: A simple visual indicator (like an orange border or a small-ish orange circle on the upper right-hand corner of the structure, or any specific color) to indicate that activities at the structure are still in progress/not fully complete). The user could infer that the activity is either RACD or bednet distribution (or both) depending on the main color-status of the structure.
Future builds with toggle feature:
>= 1 activity not possible to complete RED
This site is no longer maintained. Please visit docs.opensrp.io for current documentation.